Analysis of Subcontractor Selection Criteria by the Main Contractor in the Implementation of Building Construction in Aceh

Authors

  • Naufal Rizkyyanda Program Studi Magister Teknik Sipil, Departemen Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala
  • Cut Zukhrina Oktaviani Program Studi Magister Teknik Sipil, Departemen Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala
  • Alfa Taras Bulba Program Studi Magister Teknik Sipil, Departemen Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala
  • Mubarak Mubarak Program Studi Magister Teknik Sipil, Departemen Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

DOI:

https://doi.org/10.55927/fjst.v4i2.13

Keywords:

Selection Criteria, Subcontractors, Main Contractors, Building Construction

Abstract

The implementation of construction is greatly influenced by the role of the subcontractor chosen appropriately. The selection of inappropriate subcontractors can hinder the smooth running of the project. This process is controlled by many criteria. A total of 5 criteria that affect the selection of subcontractors by the main contractor based on previous research. Data collection by questionnaire survey of 74 building classification contractor companies with non-small qualifications. The results of this study show that the most influential criterion in the selection of subcontractors by the main contractor in the implementation of building construction in Aceh is the quality of performance with a percentage of 21.98%, followed by business and labor health 21.79%, then the previous performance of 21.61%, after that planning and control of 20.87%, and the lowest percentage is on safety performance13.75 %.

References

Abbasianjahromi, H., Sepehri, M., & Abbasi, O. (2018). A Decision-Making Framework for Subcontractor Selection in Construction Projects. EMJ - Engineering Management Journal, 30(2), 141–152. https://doi.org/10.1080/10429247.2018.1448967

Danang, R., Riyadi, N., & Arviansyah, A. (2023a). Subcontractor Selection Strategy to Minimize Subcontractor Performance Problems Using Analytical Hierarchy Process Method: Case Study at PT. Hutama Karya Infrastruktur. 4(4). https://doi.org/10.35877/454RI.qems1830

Danang, R., Riyadi, N., & Arviansyah, A. (2023b). Subcontractor Selection Strategy to Minimize Subcontractor Performance Problems Using Analytical Hierarchy Process Method: Case Study at PT. Hutama Karya Infrastruktur. 4(4). https://doi.org/10.35877/454RI.qems1830

Doloi, H. (2009). Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), 1245–1263. https://doi.org/10.1080/01446190903394541

Fachrurrazi, ., Husin, S., Munirwansyah, ., & Husaini, . (2017). The Subcontractor Selection Practice using ANN-Multilayer. International Journal of Technology, 8(4), 761. https://doi.org/10.14716/ijtech.v8i4.9490

Karaman, A. E., & Sandal, K. (2022). Effect of Sub-Contractor Selection on Construction Project Success in Turkey. Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 33(4), 12105–12118. https://doi.org/10.18400/tekderg.731728

Lew, Y. L., Hassim, S., Muniandy, R., & Hua, L. T. (2018). Structural equation modelling for subcontracting practice: Malaysia chapter. Engineering, Construction and Architectural Management, 25(7), 835–860. https://doi.org/10.1108/ECAM-04-2017-0073

Marzouk, M. M., El Kherbawy, A. A., & Khalifa, M. (2013). Factors influencing sub-contractors selection in construction projects. HBRC Journal, 9(2), 150–158. https://doi.org/10.1016/j.hbrcj.2013.05.001

Muhendra, H., & Hasibuan, S. (2018). The Sub-Contractor Selection of Fly Over Construction Project. Jurnal Manajemen Transportasi & Logistik, 05(01). http://ejournal.stmt-trisakti.ac.id/index.php/jmtranslog

Sadiq, A. M. A., & Rizki, A. S. (2022). Analisis Keberhasilan Proyek Terhadap Pengaruh Project Manager pada Pembangunan Guest House di Kota Parepare. JURNAL TEKNIK SIPIL, 7(3).

Simanjuntak, A. R. M., & Simandjorang, H. G. (2019). Kajian faktor-faktor penting manajer proyek dalam proses konstruksi bangunan gedung tinggi di jakarta pusat.

Subramaniam, C., Shamsudin, F. M., Said, A., & Alshuaibi, I. (2017). Investigating Employee Perceptions Of Workplace Safety And Safety Compliance Using Pls-Sem Among Technical Employees In Malaysia. In Journal of Applied Structural Equation Modeling (Issue 1).

Tam, V. W. Y., Shen, L. Y., & Kong, J. S. Y. (2011). Impacts of multi-layer chain subcontracting on project management performance. International Journal of Project Management, 29(1), 108–116. https://doi.org/10.1016/j.ijproman.2010.01.005

Tantarto, T., & Hermawan, P. (2023). Proposed Improvement of Subcontractor Selection Process at PT Bangun Beton. European Journal of Business and Management Research, 8(4), 146–153. https://doi.org/10.24018/ejbmr.2023.8.4.2055

Trisnawati, D. L., Dharmayanti, C. P. A. G., & Jaya, M. N. (2018). Analisis Kinerja Proyek Terhadap Kepuasan Stakeholder. Jurnal Spektran, 6(2), 205–209.

Downloads

Published

2025-02-27